Key Issues
Solution
EPESOL was awarded by GE Grid Solutions with the commissioning of five generators, approximately 13.2 MW, for the Yibal Khuff Project. EPESOL’s engineers play an integral role in conducting hot commissioning of generator and protection systems, synchronization, and power source reliability tests. Over nearly four months, by providing extensive manpower to ensure a reliable power generation, enabling continuous gas extraction from the well and processing operations despite the absence of utility. This project underscores EPESOL’s technical expertise and commitment to overcoming challenges, ensuring operational self-sufficiency, and delivering exceptional results.
Conclusion
In conclusion, the Yibal Khuff Project’s strategic commissioning of one generator, with a total capacity of approximately 13.2 MW, effectively addresses the lack of grid power generation. By entrusting EPESOL with this crucial task, GE Grid Solutions ensured the provision of a reliable and efficient power source, supporting the project’s continuous and successful operation. This collaborative effort underscores a commitment to overcoming logistical challenges and optimizing Algeria’s natural gas resources, thereby making a significant contribution to the country’s energy sector and economic growth.