General Electric (GE) played a crucial role by providing the gas turbines required for power generation. GE was responsible for supplying and installing the eight gas turbines, each with a capacity of 32 megawatts (MW). Their involvement ensured that the project had a reliable and efficient power source to support its offshore operations, contributing significantly to the overall success of the project.
Conclusion
In conclusion, the Umm Lulu Project, located offshore in Abu Dhabi, UAE, is a key oil and gas development aimed at boosting crude oil production from the Umm Lulu field. To meet the project’s significant power demands and ensure reliable operations, eight gas turbines, each with a capacity of 32 megawatts (MW), were installed. General Electric (GE) played a pivotal role by supplying and installing these turbines, providing the necessary power generation infrastructure. This on-site power solution enhanced operational efficiency and reliability, supporting the project’s success and reducing dependence on external power sources.